Cycle 8 2021 - by Block

 

Block Start date End date Purpose

Approx
Config.

min - max
baseline
(m)

beam1
(")

maximum
recoverable
scale1
(")

1 2021-10-01 2021-10-11 PI (Observing Report) C-8 110-8500 0.096" 1.4"
2 2021-10-11 2021-10-18 PI (Observing Report) C-8 110-8500 0.096" 1.4"
3 2021-10-18 2021-10-25 PI (Observing Report) C-8 110-8500 0.096" 1.4"
4 2021-10-25 2021-11-01 PI (Observing Report) C-8 110-8500 0.096" 1.4"
5 2021-11-01 2021-11-08 PI (Observing Report) C-7 64-3600 0.21" 2.6"
6 2021-11-08 2021-11-15 PI (Observing Report) C-7 64-3600 0.21" 2.6"
7 2021-11-15 2021-11-22 PI (Observing Report) C-7 64-3600 0.21" 2.6"
8 2021-11-22 2021-11-29 PI (Observing Report) C-7 64-3600 0.21" 2.6"
9 2021-11-29 2021-12-06 PI (Observing Report) C-6 15-2500 0.31" 4.1"
10 2021-12-06 2021-12-13 PI (Observing Report) C-6 15-2500 0.31" 4.1"
11 2021-12-13 2021-12-20 PI (Observing Report) C-5 15-1400 0.54" 6.7"
12 2021-12-20 2021-12-27 PI (Observing Report) C-4 15-784 0.92" 11.2"
13 2021-12-27 2022-01-03 PI (Observing Report) C-4 15-784 0.92" 11.2"
14 2022-01-03 2022-01-10 PI (Observing Report) C-4 15-784 0.92" 11.2"
15 2022-01-10 2022-01-17 PI (Observing Report) C-4 15-784 0.92" 11.2"
16 2022-01-17 2022-01-24 PI (Observing Report) C-3 15-500 1.4" 16.2"
17 2022-01-24 2022-02-01 PI (Observing Report) C-3 15-500 1.4" 16.2"
18 2022-03-01 2022-03-07 PI (Observing Report) C-1 15-161 3.4" 29.0"
19 2022-03-07 2022-03-14 PI (Observing Report) C-1 15-161 3.4" 29.0"
20 2022-03-14 2022-03-21 PI (Observing Report) C-1 15-161 3.4" 29.0"
21 2022-03-21 2022-03-28 PI (Observing Report) C-2 15-314 2.3" 22.6"
22 2022-03-28 2022-04-04 PI (Observing Report) C-2 15-314 2.3" 22.6"
23 2022-04-04 2022-04-11 PI (Observing Report) C-2 15-314 2.3" 22.6"
24 2022-04-11 2022-04-18 PI (Observing Report) C-2 15-314 2.3" 22.6"
25 2022-04-18 2022-04-25 PI (Observing Report) C-3 15-500 1.4" 16.2"
26 2022-04-25 2022-05-02 PI (Observing Report) C-3 15-500 1.4" 16.2"
27 2022-05-02 2022-05-09 PI (Observing Report) C-3 15-500 1.4" 16.2"
28 2022-05-09 2022-05-16 PI (Observing Report) C-3 15-500 1.4" 16.2"
29 2022-05-16 2022-05-23 PI (Observing Report) C-3 15-500 1.4" 16.2"
30 2022-05-23 2022-05-30 PI (Observing Report) C-4 15-784 0.92" 11.2"
31 2022-05-30 2022-06-06 PI (Observing Report) C-4 15-784 0.92" 11.2"
32 2022-06-06 2022-06-13 PI (Observing Report) C-4 15-784 0.92" 11.2"
33 2022-06-13 2022-06-20 PI (Observing Report) C-4 15-784 0.92" 11.2"

 

1Note: the synthesized beam and maximum recoverable scale are tabulated for a frequency of 100 GHz. To calculate these quantities for a given frequency (measured in GHz), multiply the tabulated values by (100 / frequency).

2LBR = Long Baseline Reconfiguration. ACA and Total Power Observations only.

 

Complete Tentative Cycle 8 2021 Configuration Schedule1

Start date Config min - max
baseline
(m)
beam
(")1
maximum
recoverable
scale
(")1
2021-10-01 C-8 110-8500 0.096" 1.4"
2021-10-20 C-7 64-3600 0.21" 2.6"
2021-11-20 C-6 15-2500 0.31" 4.1"
2021-12-01 C-5 15-1400 0.54" 6.7"
2021-12-20 C-4 15-784 0.92" 11.2"
2022-01-10 C-3 15-500 1.4" 16.2"
2022-02-01 February Maintenance Period
2022-03-01 C-1 15-161 3.4" 29.0"
2022-03-20 C-2 15-314 2.3" 22.6"
2022-04-20 C-3 15-500 1.4" 16.2"
2022-05-20 C-4 15-784 0.92" 11.2"
2022-06-20 C-5 15-1400 0.54" 6.7"
2022-07-11 C-6 15-2500 0.31" 4.1"
2022-07-30 C-5 15-1400 0.54" 6.7"
2022-08-20 C-4 15-784 0.92" 11.2"
2022-09-10 C-3 15-500 1.4" 16.2"

1NOTE: The Configuration Schedule is SUBJECT TO CHANGE.

 

 

Link to Cycle 7 - 9 Configuration Schedules

 

Link to Configuration Schedules From Prior Cycles